E-Con · Kit Academy
Learn the kit. Pass the exam. Join the network.
Three short tracks teach the Calma V1 Kit-of-Parts and the E-Con site protocol with the same values the drawings use. Study the cards, answer ten questions, and score 85% or more to get a verifiable E-Con Kit Pass.
What a pass is — and is not
An E-Con Kit Pass certifies Calma V1 Kit-of-Parts component and hold-point literacy for community referrals and owner-managed work packages. It is not a PCAB/PRC government license or permit, and it creates no employment or agency relationship with MDCC TECH OPC, which supplies engineered Core Kits A–B materials only (Open-C architectural finishes are bought direct from owner-chosen suppliers at ₱0 MDCC). Owners still choose, contract and pay their installer directly.
Mastery stamps — earned by passing each track
- A-S1
- B-S1
- B-S2
- C-S1
- C-S2
- C-S3
- D-S1
- D-S2
- PROTOCOL
Offline job-site study mode
Online · live exam grading readySave all three tracks and part diagrams on this phone so crews can review steps on low-signal sites.
Interactive sequence & hold-point map
Follow the site sequence from left to right. Tap any node to inspect its part layers, tolerances, and hold-point rule.
3D exploded layers & tolerance hotspots
Drag the slider to separate factory layers, read each interface tolerance, or download the 3D .glb part model for mobile inspection.
Layer callouts
- 1Clear perforated formwork box
600 × 800 × 600 mm envelope, 0.50 mm UV-stabilized polyethylene with Ø 50 mm base holes
Modular 2.0–2.4 m lengths; maximum 6.0 m continuous run before a doweled construction joint.
- 2Strip foundation base cage
600 × 800 × 250 mm hybrid composite and deformed steel bar mat
Minimum 40 mm concrete cover on all faces; continuous reinforcement across 4.5–6.0 m joint intervals.
- 3Pedestal stem cage
350 mm high × 250 mm wide longitudinal stem cage
Receives site-placed 21 MPa (1:2:3 mix, 10 mm max gravel) concrete cured wet for 7 days.
Joint tolerances
Field assembly checks0 of 3 field checks done
2-minute flashcard drill
Practice key tolerances with spaced repetition on your phone before submitting the server-graded exam.
0 of 7 cards mastered · 7 due now
Kit A · SFP
Strip footing box
Study cards
Kit A · SFP
Strip footing box
SFP is Kit A's clear strip footing box with a pre-tied starter cage, set on a string line and filled with site concrete.
Shop schematic
Kit A · SSC
Wall-starter L-rods
SSC wall-starter L-rods (Ø 12 mm composite, 300–400 mm pitch) tie the footing and slab to the walls that land later.
Shop schematic
Kit A · GFM + GB
Ground slab mesh over gravel
GFM ground slab mesh is laid over a compacted GB gravel and clean sand bed, never on bare unprepared soil.
Shop schematic
Kit A · SGC / WLPC
Under-slab pipes
SGC sanitary and WLPC waterline pipe groups are placed and checked under the slab before the ground slab is poured.
Shop schematic
Kit A · CST
Yard septic tank
CST is a 1000 L pre-molded three-chamber yard septic vessel set on a clean sand cushion.
Shop schematic
Site-local · SCS + GB
Crate vs site-local
The factory crate carries the kit parts. SCS concrete and GB gravel/sand are standard mixes sourced locally on site.
Package A+B
What A+B never carries
ELB-W bearing wall panels belong to Core Kit B (erected under Package C+D). Package A+B stops at the Kit A footing, slab, pipes and septic.
Qualification exam
10 questions · pass at 85% · graded on the server