Calma Blocks · e-con
e-con · Engineered Components & Delivery
Engineered components. Assembled into your home.
e-con
Engineered components. Assembled into your home.
e-con means Engineered Components: a simpler way to design and order the parts of your building. Design your Block. Confirm its component package. Receive it in stages.
Start in H20, the Block Instrument. Create a Block with your budget, deed restrictions, design references and site constraints. Add site evidence, including a soil-test report, as it becomes available. Confirmed inputs guide checks; open items remain visible.
From your idea to your site
Design your Block.
- Create a Block and explore designs
- Review your chosen design and unsigned FCD
Confirm its component package. Receive it in stages.
- Confirm categories and approve your quote
- Receive the confirmed package in stages
You can lead your own design and build within the component system and your budget. Arrange your installer or request optional Component E through the guide; E requires A-2 signed-and-sealed support first. For Component E, submit a land survey prepared by a geodetic engineer.
Installation requirements →Next: save your Block, then request a quote.
Create a Block →Your Block playbook
Five stages to explore. This guide does not show your saved or order status.
1Explore
- Set your starting point
- Give the house its ground
- Deal your first options
- Try one design move
- Keep a contender
2Save & return
- Make this your saved Block
- Keep your account in the loop
- Pick up the same Block
3Review the design
- Step inside your choice
- Meet the parts
- Documents by email
4Confirm & order
- Build your component order
- Turn a choice into a quote
- Match the invoice to the transfer
- Plan Component E early
5Receive & hand off
- Receive one stage at a time
- Close the loop carefully
Your category guide
- A
- A-1 / A-2
- B
- C
- D
- E
A · Footings. B · Ground floor & MEP. C · Shell. D · Architectural items. A-1 is unsigned instrument output on an approved walk, whether or not you buy footings; it is never a payment line. A-2 is optional licensed sign & seal. Optional E covers installation and permit processing, with A-2 and a land survey by a geodetic engineer required.
Read scope, inclusions, exclusions, payment and delivery terms below before approving a quote.Components
You order the components for this design. A, B, C, and D are each one lot. Part counts come from your design’s parts list.
A-1 · AoR + FCD + IM · Unsigned
A-1 is the unsigned AoR + FCD + IM: Architecture of Record, For Construction Drawings and Installation Manual. Issued documents are emailed; the Block records sending evidence. Missing details and unreviewed instructions stay pending. Coordination checks do not establish structural capacity, MEP sizing or permission to build.
Freight
Freight is not in the component price. You pay the carrier directly.
Component E · Installation & permit processing
MDCC TECH OPC contracts with you and invoices Component E. MDCC appoints and pays the installation subcontractors. Scope and price must be agreed in writing; saving a Block does not book installation. Plan early. Mobilize after all required materials are received and checked, the site is ready, and required approvals are in place.
A–D components and agreed Component E: MDCC TECH OPC. Freight: pay the carrier directly.
Request an itemized quote for your saved Block. Staff can confirm amounts on that quote.
Before you order
- One Block, one agreed package, staged delivery. Your quote names the components, quantities, net amount, VAT and total.
- Pay MDCC for components. Pay Homeqube for instrument credits. Pay your carrier for freight. A transfer reference is not confirmed payment.
- A-1 is unsigned output. A-2 is licensed support. Optional E needs A-2, a geodetic survey and an accepted service agreement.
- Fully paid category scope is locked. Changes, cancellation, delivery claims and remedies stay on the same Block, under its accepted terms.
Read the exact quote, agreement and payment terms before accepting or paying. They record your scope, amounts and dates. Earlier accepted terms remain on their order; this page does not rewrite them. Open particulars must be agreed in writing before payment.
How the price is made
Each category is one lot: computed floor area × the rate on file × your factors. A factor is not a count of parts.
- One lot per category
- A, B, C, and D are each one lot.
- Floor area
- The square metres are the computed floor area of this design. B uses the ground floor. A, C and D use the total floor. They are not a catalog size and not a part count.
- Factors
- Storeys adjust A and C. Skin adjusts D. Glazing adjusts C and D. These factors change the lot price. They do not add parts.
- A-1 and A-2
- A-1 · Instrument output, the unsigned Block Technical Pack, comes with every Block when you approve the walk, whether or not you buy A. It is not a payment line. A-2 · Licensed sign & seal is a separate lot if you order it. Your quote states whether A-2 is separately charged or already included in an agreed installation scope.
- Not in this price
- Freight: you pay the carrier. Component E is a separate MDCC TECH OPC installation package at the original selected FCD area. A-2 and a geodetic survey are required. E checkout stays closed.
Category amounts are quoted as lots; part counts follow the drawings’ schedule. Changes need an accepted new quote; a fully paid category keeps its agreed scope.
Drawings on category A
A-1AoR + FCD + IM · UnsignedA-1 is the unsigned AoR + FCD + IM: Architecture of Record, For Construction Drawings and Installation Manual. Issued documents are emailed; the Block records sending evidence. Missing details and unreviewed instructions stay pending. Coordination checks do not establish structural capacity, MEP sizing or permission to build.
A-2Optional licensed sign & seal, billed by MDCC TECH OPC: the signed-and-sealed design set and signed as-built set at completionThe quote confirms the professional scope and reviews. Component E requires an A-2 order and a geodetic engineer’s land survey.
These drawings are not approval to build. Site evidence, professional review and permit requirements must be resolved for your project.
Appoint licensed professionals for site-specific design and approvals. Your quote states which documents are included.
Common questions
Is the budget shown my final price?
No. It is an estimate. The quote lists component lots net of VAT, then VAT 12% as its own line. A–D components and agreed Component E: MDCC TECH OPC. Freight: pay the carrier directly.
What do I need for a quote?
Save your Block. Add your site location, budget and scope requests to the quote request. Request E from MDCC TECH OPC with your A-2 order and geodetic engineer’s survey. Agree the scope, rate, milestones, professional acceptance and bond in writing. E covers permit processing; official permit fees are separate and approval remains with the authority.
Can I plan from abroad?
Yes. Explore and save your design online. Your house site stays in the Philippines. For components-only orders, you arrange an installer and site readiness; confirm delivery responsibilities with the project team.
A–D materials. A-1 / A-2 drawings. Optional E.
A · Footings. B · Ground floor & MEP. C · Shell. D · Architectural items. A-1 is unsigned instrument output on an approved walk, whether or not you buy footings; it is never a payment line. A-2 is optional licensed sign & seal. Optional E covers installation and permit processing, with A-2 and a land survey by a geodetic engineer required.
Structure, MEP, glazing and interiors are the component groups inside those categories.

Alphabetical component network: A–D core material categories · E optional installation & permit processing · F, G, H, I under development for future release.
Component delivery category A
Site preparation & footings
Setting out, clearing, excavation and footing placement. The guide illustrates GFRP columns and GFRP plinth / ground beams alongside the site work.
A-1AoR + FCD + IM · UnsignedA-1 · AoR + FCD + IM · Unsigned. A-1 is the unsigned AoR + FCD + IM: Architecture of Record, For Construction Drawings and Installation Manual. Issued documents are emailed; the Block records sending evidence. Missing details and unreviewed instructions stay pending. Coordination checks do not establish structural capacity, MEP sizing or permission to build.
A-2Licensed sign & seal· Optional licensed sign & seal, billed by MDCC TECH OPC: the signed-and-sealed design set and signed as-built set at completion. The quote confirms the professional scope and reviews. Component E requires an A-2 order and a geodetic engineer’s land survey.
Component delivery category B
Ground-floor EPS & MEP lines
MEP lines, ground-floor EPS, first pouring and first spraying. Illustrated components include MEP pipes, an FRP septic tank, GFRP rebars, floor dowels, EPS wall and floor panels, and GFRP floor mesh.
Component delivery category C
Structural shell & staircase
Structural shell and staircase, second and third spraying, and precutting EPS openings. The guide shows EPS stairs, rockwool and wall vertical stiffeners using GFRP and steel rebars where required by the project design.
Component delivery category D
Architectural installation & connections
Architectural skins, soft-stone installation, drywall partitions, doors and windows, fixtures and lights, electrical work and MEP connections. Illustrated items include toilet-and-bath sets, modular kitchen counters, cabinets, doors, finishes and backer boards.
Component delivery category E · Optional
Installation & permit processing
Request E from MDCC TECH OPC with your A-2 order and geodetic engineer’s survey. Agree the scope, rate, milestones, professional acceptance and bond in writing. E covers permit processing; official permit fees are separate and approval remains with the authority.
Component delivery category F · Under development · Future
Component network expansion (Under development)
Reserved in the alphabetical Calma Blocks component network for future pre-engineered component packages. Under development for future release; not part of current A–E quotes.
Component delivery category G · Under development · Future
Component network expansion (Under development)
Reserved in the alphabetical Calma Blocks component network for future pre-engineered component packages. Under development for future release; not part of current A–E quotes.
Component delivery category H · Under development · Future
Component network expansion (Under development)
Reserved in the alphabetical Calma Blocks component network for future pre-engineered component packages. Under development for future release; not part of current A–E quotes.
Component delivery category I · Under development · Future
Component network expansion (Under development)
Reserved in the alphabetical Calma Blocks component network for future pre-engineered component packages. Under development for future release; not part of current A–E quotes.
Agree the batch schedule before delivery.
For each category, confirm the component list, quantities, specifications, batch identifiers, installation sequence and site readiness with the project team. Record freight arrangements, unloading and storage responsibilities in the agreed delivery plan. Check each arriving batch against its manifest and record shortages or damage before acceptance.
This is an installation overview, not a construction method statement. The approved project drawings and appointed professionals determine the actual sequence, connections and installation details. Illustrated items do not replace your agreed specification. Windows and the specified semi-furnished package remain baseline inclusions; additional cabinetry is a separately quoted addition.
Owner purchases listed in the client guide
The guide identifies the following local purchases. Confirm quantities, specifications and who arranges each item in your quote. This checklist does not add an automatic charge to an existing order.
Materials
- Portland cement
- Vibro sand
Tools
- Rotary hammer drill
- Mini bolt cutter
- Mini hacksaw
- Plumb bob
- Level bar
- Shovel
- Heat gun
Mixing & spraying equipment
- One-bagger mixer
- Turbosol Mini-Avant
Also confirm site equipment responsibility
Digging tools, shoring jacks and scaffolding appear beside the installation activities, outside the explicit owner-purchase list. Agree who provides or hires them before work starts; do not assume they are included in component delivery or automatically an owner purchase.
Component E · Installation & permit processing
Component E requires an A-2 order first: signed-and-sealed design support. A-1 alone does not qualify. For Component E, submit a land survey prepared by a geodetic engineer.
MDCC TECH OPC contracts with you and invoices Component E. MDCC appoints and pays the installation subcontractors. Scope and price must be agreed in writing; saving a Block does not book installation.
Plan early. Mobilize after all required materials are received and checked, the site is ready, and required approvals are in place.
Request E from MDCC TECH OPC with your A-2 order and geodetic engineer’s survey. Agree the scope, rate, milestones, professional acceptance and bond in writing. E covers permit processing; official permit fees are separate and approval remains with the authority.
- Price and design
- Per m² against the agreed original FCD revision; the chargeable area and rate are stated in one Installation Service Agreement. Review your design before paying. The down payment locks the scope. Later design changes require a new quotation and written agreement before affected work proceeds. For Component E, submit a land survey prepared by a geodetic engineer.
- Payment
- 50% down payment; 50% upon commissioning. No retention. These are Component E terms, not the A–D material payment schedule.
- Included
- Permit processing and coordination, surveying, excavation, installation sundries, installation and commissioning. MDCC TECH OPC contracts and invoices; MDCC appoints and pays subcontractors.
- Excluded
- Official permit fees, applicable village bonds, landscaping, fences and renewable-energy systems. These are for the owner or others. Unofficial payments are not included or facilitated.
- Program
- Target: six months after all required materials are delivered and checked, with site access, readiness and applicable permits in place. Record delays and schedule changes in writing; this is not an unconditional completion guarantee.
- Professional acceptance and bond
- Completion acceptance is based on the relevant A-2 professionals. Record their inspection and certification duties in the agreement. A DLP bond is required; its percentage, provider, coverage and start date must be agreed in writing. Cancellation and refund terms must also be settled before the deposit.
Engineering personnel and installation network
MDCC confirms the assigned subcontractor, personnel, availability and scope for each Component E order. Listing a contact is not an appointment.
- Region 1, CAR, and 2Engr. Visda
- Region 3Engr. Santos
- Region 4A and 5Engr. Berin
- Region 4B, 6, 7, and 8Engr. Palenzuala
- NCRMDCC TECH OPC
Existing referral arrangements
Existing referral orders keep their agreed terms. Their rates, payment split and bond terms are not Component E terms.
Indicative installation: ₱8,000–₱13,000 per m², net of VAT. Confirm the measured area and final amount in the installer’s quote.
Installers are independent third-party contractors. You appoint, contract with and pay the installer directly. This is separate from your component order. “Accredited” names this referral list, not a government accreditation. Confirm availability and scope before appointing.
- Payment
- Installer contract: 50% down payment for the A/B/C stage; 50% balance for Category D, before completion. These percentages are not component-payment instructions.
- Defect liability
- Installation defects are the installer’s responsibility under its contract, with a one-year defect-liability bond. Confirm the start date, bond amount, issuer and claim process in writing. Material-defect claims remain separate.
- Included
- Permitting, surveying, excavation, material sundries, full installation and commissioning.
- Excluded
- Village bonds, where applicable; fences; landscaping; renewable energy. Unofficial permit payments (lagay) are not included or authorized.
From design to delivery
What comes with your Block?
Component E requires an A-2 order first: signed-and-sealed design support. A-1 alone does not qualify. For Component E, submit a land survey prepared by a geodetic engineer.
e-con · engineered components
e-con means Engineered Components: a simpler way to design and order the parts of your building. Design your Block. Confirm its component package. Receive it in stages.
How components come together
- 01
Structure
The main assembly that gives the house its form. Confirm structural components and connections in the project scope.
- 02
MEP
Mechanical, electrical and plumbing components. Equipment, service connections and coordination depend on the agreed specification.
- 03
Glazing
The specified glazing package, coordinated with the house openings and interfaces.
- 04
Interiors
The agreed interior components and finishes. Read the specification for what makes up the semi-furnished package.
Know the scope before you order.
MDCC TECH OPC contracts with you and invoices Component E. MDCC appoints and pays the installation subcontractors. Scope and price must be agreed in writing; saving a Block does not book installation.
Stages are not truck trips.
Component stages follow the confirmed project sequence. Delivery is four categories: A, B, C, and D. Trips can be more than four. These are material categories; Component E is the installation service. Freight to site is for the owner’s account under the agreed delivery arrangements.
An instrument, with people behind the project.
Request E from MDCC TECH OPC with your A-2 order and geodetic engineer’s survey. Agree the scope, rate, milestones, professional acceptance and bond in writing. E covers permit processing; official permit fees are separate and approval remains with the authority.
e-con · engineered components
e-con means Engineered Components: a simpler way to design and order the parts of your building. Design your Block. Confirm its component package. Receive it in stages.
For components-only orders: You appoint and pay the installer. A referral is an introduction.
Unsigned Block Technical Pack
A-1 · Instrument output is the unsigned Block Technical Pack. It comes with every Block when you approve the walk and is not a payment line. A-2 · Licensed sign & seal is optional and priced in your quote.
MDCC TECH OPC contracts with you and invoices Component E. MDCC appoints and pays the installation subcontractors. Scope and price must be agreed in writing; saving a Block does not book installation.
01
AoR · Architecture of Record — design and components
02
FCD · For Construction Drawings — drawings and checks
03
IM · Installation Manual — pending reviewed component instructions
Replayed on calmabasic.com · Sep 24, 2026 · compile → Hold · proposed → 13 files · integrity ok
Desk demonstration on the live host — not a customer run. H2O-1-2B-A12-LY · 21b6fad0
On file
Villages
Deed of restrictions for a village already on the platform.
Your licensed professionals
Appoint licensed professionals for site-specific design and approvals. Your quote states which documents are included.
For components-only orders: You appoint and pay the installer. A referral is an introduction.
Calma.Basic · installation service →Freight
Freight is not in the component price. You pay the carrier directly. Booking, unloading, and inspection are confirmed in writing on the order.
You accept inspected components on the Block. A defect, damage, incorrect item, or shortage stays open until it is resolved.
Drawings
Issued documents are sent by email. Your Block keeps their revision and send record. A generated view or send record is not approval to build.
Not in the component price
Your quote and the category guide list what is included. Freight, installation, and anything outside those definitions are not in the component price.
Sample pricing — not a quotation
These amounts exercise the component formula. They are not a quotation, a supplier rate, or an approved selling price.
Sample book demo-sample-2026-09-28
- A · Delivery · MDCC TECH OPC · Footings · 1 lot₱864,000
- A-1 · Instrument output · Homeqube · AoR + FCD + IM · UnsignedInstrument output · no charge
- B · Delivery · MDCC TECH OPC · Ground floor & MEP · 1 lot₱432,000
- C · Delivery · MDCC TECH OPC · Shell · 1 lot₱336,000
- D · Delivery · MDCC TECH OPC · Architectural items · 1 lot₱528,000
- E · Installation · MDCC TECH OPCNot on file
Sample component total, net of VAT: ₱2,160,000
- A · Delivery · MDCC TECH OPC · Footings · 1 lot₱864,000
- A-1 · Instrument output · Homeqube · AoR + FCD + IM · UnsignedInstrument output · no charge
- B · Delivery · MDCC TECH OPC · Ground floor & MEP · 1 lot₱432,000
- C · Delivery · MDCC TECH OPC · Shell · 1 lotNot on file
- D · Delivery · MDCC TECH OPC · Architectural items · 1 lotNot on file
- E · Installation · MDCC TECH OPCNot on file
No sample total. Unknown costs stay unknown.
Freight is owner-paid and excluded from this total.
Installation is a separate arrangement and excluded from this total.
This section does not save an order.
Your Block’s price breakdown is on its design page.
How these sample numbers were chosen
- Synthetic pesos chosen to exercise the component formula. Not a selling price.
- Rates are net of VAT. A quote adds VAT 12% as its own line.
- The lot uses computed floor area, storeys, skin, and glazing. Part counts are not a second charge.
- A-1 is instrument output. It is not a payment line.
- Three storeys and feature glazing are left unknown.
- Freight is owner-paid and excluded. Installation is a separate arrangement and excluded.