Guide · contract

Design-build vs design-only.

Calma.Basic homes sit under a design-build contract with MDCC TECH OPC — DFMA assembly under Performance Based Contracting. This is not a design-only engagement.

Prior plant work — labeled structural columns with QC OK marks, San Simon (not a Calma.Basic product)
Prior plant QC — capability proof, not a Calma.Basic product.

share

instagram · facebook · whatsapp · copy

facebookwhatsapp

page link · instagram · facebook · whatsapp

Design-build (what we use)

MDCC TECH OPC holds the design-build contract for Calma.Basic — design and build of the DFMA assembly under Performance Based Contracting. This is not a design-only engagement.

Design-only (what this is not)

A design-only engagement stops at drawings and advice. Someone else still has to build. Calma.Basic is not sold as design-only A&E — the assembly is design-built under Performance Based Contracting.

Who does what

JP Calma is the Building System Architect & System Designer — models, materials, interfaces, pre-engineered components, and interior design specifications. MDCC TECH OPC holds the design-build contract for the DFMA assembly.

Performance Based Contracting

The frame is performance of the DFMA assembly system — clear commercial terms, plant manufacture, and nationwide delivery within the stated window — not open-ended site craft.

FAQ

Who is the design-build party?

MDCC TECH OPC. Your agreement defines the scope and responsibilities.

Is JP Calma the contractor?

JP Calma is the systems designer. MDCC TECH OPC is the Calma.Basic contract party.

Design-Build vs Design-Only — MDCC TECH OPC · Calma.Basic