Guide · contract

Design-build vs design-only.

Calma.Basic homes sit under a design-build contract with MDCC TECH OPC — DFMA assembly under Performance Based Contracting. This is not a design-only engagement.

Prior plant work — labeled structural columns with QC OK marks, San Simon (not a Calma.Basic product)
Prior plant QC — capability proof, not a Calma.Basic SKU.

share

instagram · facebook · whatsapp · copy

facebookwhatsapp

page link · instagram · facebook · whatsapp

Design-build (what we use)

MDCC TECH OPC holds the design-build contract for Calma.Basic — design and build of the DFMA assembly under Performance Based Contracting. This is not a design-only engagement.

Design-only (what this is not)

A design-only engagement stops at drawings and advice. Someone else still has to build. Calma.Basic is not sold as design-only A&E — the assembly is design-built under Performance Based Contracting.

Who does what

JP Calma is the Building System Architect & System Designer — models, materials, interfaces, pre-engineered components, and interior design specifications. MDCC TECH OPC holds the design-build contract for the DFMA assembly.

Performance Based Contracting

The frame is performance of the DFMA assembly system — clear commercial terms, plant manufacture, and nationwide delivery within the stated window — not open-ended site craft.

FAQ

  • Who is the design-build party?

    MDCC TECH OPC — design-build for the Calma.Basic DFMA assembly under Performance Based Contracting.

  • Is JP Calma the contractor?

    JP Calma is the Building System Architect & System Designer. The design-build contract for the assembly is with MDCC TECH OPC.